Projects

Delivered Works
Across Ghana

From urban upgrades to highway rehabilitation, we kept corridors moving with staged works and traffic control, enforced rigorous QA at every layer, coordinated with stakeholders, and handed over durable, on-spec assets—on time and within budget.

Atobiase Bridge Project

Client:
Department Of Feeder Roads
Period:
2005

Rehabilitation Of Sankor–Cape Three Point Road

Client:
Department Of Feeder Roads
Period:
2005

Bitumen Surfacing Of Aboabze–Ayiem

Client:
Department Of Feeder Roads
Period:
2004-2006

Bitumen Surfacing Of Aboso–Achiese

Client:
Department Of Feeder Roads
Period:
2004-2006

Bitumen Surfacing Of Aboso–Achiese

Client:
Department Of Feeder Roads
Period:
2004-2006

Bitumen Dressing Of Aiyinase Town Road – Phase 1

Client:
Department Of Feeder Roads
Period:
2004 - 2006

Tarring Of Ofoase Bridge Deck E/R

Client:
Al-Khodari & Sons Ltd
Period:
2003 - 2004

Tarring Of Jomoro Bridge Deck W/R

Client:
Al-Khodari & Sons Ltd
Period:
2002 - 2003

Tarring Of Hiawa Bridge Deck W/R

Client:
Al-Khodari & Sons Ltd
Period:
2002 - 2003

Thermal Plant – Aboadze – Abuesi Roads Takoradi Phase 2

Client:
Volta River Authority/World Bank
Period:
1999 - 2000

Rehabilitation Of Gbanga Zorzor Highway Liberia

Client:
Government Of Liberia / World Food Programme
Period:
1998 - 2000

Urban Environment Sanitation Project (Urban 4) Roads

Client:
Government Of Ghana/World Bank
Period:
1998 - 2000
© 2025 Eagle Star Enterprises Limited. All rights reserved.